Vietnam
-
Lac Da Vang is expected to deliver as much as 40,000 BOE/D at peak.
-
This paper describes a customized solution using a thixotropic organically crosslinked polymer as a treatment design for a subhydrostatic and highly aromatic offshore gas well.
-
China Coast Guard patrols near oil and gas projects in the South China Sea have triggered responses from Vietnamese law enforcement and the Malaysian navy in two separate incidents over the past month.
-
The plants are expected to be put into operation no later than 2024.
-
The metocean and tidal conditions led to the development of the jetty-less solution for the project, which Delta Offshore continues to push toward FID.
-
The FEED contract is expected to be converted into an engineering, procurement, construction, and installation contract in Q1 2021.
-
Amidst a conflict between Vietnam and China over the South China Sea, the Malaysian company’s 10-year deal to supply an FPSO for the Ca Rong Do offshore field is now history. Repsol, the operator of Ca Rong Do, suspended the project last year in the wake of government pressure.
-
The Italian operator reported positive appraisal and exploration results from wells drilled some 10,000 km apart.
-
This paper discusses how managed-pressure-drilling (MPD) technology led to cost savings in two wells drilled in the Hai Thach gas field offshore southern Vietnam.
-
One common issue among operators in determining whether to install a managed-pressure-drilling (MPD) system for a campaign is the significant upfront cost.
Page 1 of 2