Santos Basin
-
Contractor will design FPSO hull and related topsides facilities for the project located in the Santos Basin offshore Brazil
-
Updates about global exploration and production activities and developments.
-
The post-salt, heavy-oil fields will be developed in tandem tied back to an FPSO.
-
The work covers integrated well construction services for the Búzios field off Brazil.
-
The Libra Consortium, led by Brazil’s Petrobras, has developed a method of separating carbon dioxide from reservoir fluids at the seafloor rather than the FPSO topsides.
-
Supermajor down, but not out of Brazilian exploration game.
-
The new floater is producing oil from the Itapu field in the Santos Basin
-
The French operator will tie satellite field back to existing FPSO, with first oil expected in around 2 years.
-
A second well, Curaçao, also encountered commercial oil volumes in the Santos Basin.
-
The supermajor is expected to put off green-lighting the presalt project for up to 2 years.
Page 1 of 3