Sand management/control

To avoid costly interventions like sidetracking or wellbore abandonment, a check-valve system was installed near the sandface within three injector wells which prevented the mobilization of fines from the reservoir into the wellbore by stopping backflow.
This paper outlines issues to be resolved during facility design and provides guidelines, calculations, and examples for sand-handling steps to be implemented after separation.
The authors of this paper describe a project in which retrofitted autonomous inflow control devices were deployed successfully in a field to minimize water production and maximize oil recovery.

Page 1 of 7