JPT December 2020 Issue

2020-12-72.jpg

On the Cover
After it is mined, wet sand is left to decant in piles before being sent into industrial-sized kilns where it is dried in preparation for sorting. Skipping the costly drying process represents a new trend in the US unconventional sector where cost pressure continues to reshape the proppant supply chain. Source: Getty Images.

President's Column
2021 SPE President
I begin this column by saying that after attending several recent SPE events filled with students and professionals, all virtual of course, that I have seen the very best of us as members of SPE. To a person, you all have been nothing short of inspiring.
Monthly Features