Field X consists of 17 scattered clusters of more than 100 oil wells producing from different reservoirs. Rapid expansion of the network has made the lifting network extremely busy and has resulted in many low-lifting-gas-rate ends. An easy solution is to increase lifting-gas use, but this is expensive. A more economical option is to restructure the gas lift surface pipelines, on the basis of proper engineering, by rerouting the surface network to reduce branching and enhance lifting-gas pressures and rates while maintaining the same level of lifting-gas use.
Introduction
The main gas lift 4-in.
×