Reliability-Based Casing Design Unlocks Reserves in a High-Pressure Gas Field

Increasing recovery was considered by lowering the reservoir-abandonment pressure below the initial design value. Design assumptions and equipment ratings were reviewed systematically to determine which aspects factored into the decision to change reservoir management. Collapse loading of the 10-in. production liner was identified as a key variable. This paper presents work performed to characterize the probability of collapse as a function of reservoir-abandonment pressure using reliability-based design (RBD).
Introduction
For the high-pressure gas field under consideration, future-field-development studies were conducted alongside execution of the development. One such study investigated the potential application of gas compression to the field. Gas compression reduces the pressures downstream of the wellhead to allow depleted reservoirs to flow at lower pressures. The potential benefit is increased reserves recovery with effectively no increase in well cost.
The reservoir design and operating limit (RDOL) defines the lower allowable pressure from a reservoir perspective. Engineering studies have shown that this limit is set by the well design and operating limit (WDOL). If compression options are pursued, proposed depletion pressures should be checked for consistency with the limits prescribed by the RDOL and WDOL. With compression, when the wellhead pressure is reduced, the wellbore pressures may approach the lower end of the WDOL. This increases the pressure differential across the 10-in. liner section, which can result in a collapse failure, as illustrated in Fig. 1 above.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Reliability-Based Casing Design Unlocks Reserves in a High-Pressure Gas Field
01 June 2018
Smart Robotic System Tracks Buried Pipelines, Inspects for External Damage
The complete paper describes the development of a smart robotic inspection system for noncontact condition monitoring and fault detection in buried pipelines.
Surface Treatment Improves Flow Assurance and Throughput in Corroded Pipe
This paper describes a material designed to interact specifically with highly corroded and weathered pipe to enable in-place application and refurbishment.
BP To Sell Alaska Business to Hilcorp
The $5.6-billion deal includes the Prudhoe Bay field and the Trans Alaska Pipeline and vaults Hilcorp to be the second-largest Alaska producer and reserves holder, behind only ConocoPhillips.
No editorial available
ADVERTISEMENT
STAY CONNECTED
Don't miss out on the latest technology delivered to your email weekly. Sign up for the JPT newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
No editorial available
ADVERTISEMENT
ADVERTISEMENT