Flow-Control Optimization Maximizes Accuracy of Multiphase-Flow Rate Allocation

The value added by intelligent wells (I-wells) derives from real-time reservoir and production-performance monitoring together with zonal downhole flow control. Unfortunately, downhole sensors that directly measure the flow rates and phase cuts required for optimal control of the well’s producing zones are not typically installed. This paper describes an “active” monitoring technique that uses a direct search method to optimize the sequence of interval-control-valve (ICV) positions during a routine multirate test in an I-well.
Introduction
I-well completions include both downhole flow-control tools and monitoring sensors. Reservoir inflow is controlled by means of passive devices [inflow-control devices (ICDs)], active valves (ICVs), and self-adjusting devices (autonomous ICDs and autonomous ICVs). Reservoir and well-performance properties should be monitored regularly to support flow-control decisions efficiently. Various physical quantities, including temperature, pressure, flow rate, acoustics, strain, and seismic, are currently measured by electronic, radioactive, and fiber-optic sensors to assist the multiphase-flow rate allocation in I-wells.
Producing from only a single well or zone during a test is a common practice. This delivers a single flow-rate value measured at a particular time. However, this approach is inefficient, resulting in lost production and possible difficulties when trying to restart the closed-in wells or zones. A costly production-logging well intervention is a possible alternative; it does provide an inflow rate and a phase-cut profile, but only at a specific time without the possibility of delivering the current phase cut and production rate continuously.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Flow-Control Optimization Maximizes Accuracy of Multiphase-Flow Rate Allocation
01 May 2016
Analytical Study Examines Production of Multistage Horizontal Wells in the Bakken
Multistage horizontal well designs were first implemented in the Bakken in 2007. Since then, more than 12,000 wells have been completed in either the Middle Bakken or Three Forks zones.
Smart Robotic System Tracks Buried Pipelines, Inspects for External Damage
The complete paper describes the development of a smart robotic inspection system for noncontact condition monitoring and fault detection in buried pipelines.
Integrated Deepwater MPD Control System Increases Accuracy, Ease of Use
This paper presents lessons learned regarding design, testing, and installation of a completely integrated managed-pressure-drilling (MPD) control system on a deepwater drilling rig.
No editorial available
ADVERTISEMENT
STAY CONNECTED
Don't miss out on the latest technology delivered to your email weekly. Sign up for the JPT newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
No editorial available
ADVERTISEMENT
ADVERTISEMENT