Santos Energy
-
Operator TotalEnergies wants to rework the EPC contract packages after initial bids challenged project economics.
-
The Australian oil and gas company said the new commitments underscore its goal to achieve net zero Scope 1 and 2 emissions by 2040.
-
The newbuild FPSO is destined for the giant Australian gas project in 2025.
-
HiberHilo will be used to monitor remote oil and gas wells in Papua New Guinea, providing real-time performance and safety data.
-
ExxonMobil has initiated front-end engineering design studies to determine the feasibility of developing a South East Australia carbon capture and storage hub in the Bass Strait, where some of Australia’s oldest offshore oil and gas fields are to be decommissioned.
-
Gas production from the new field will be used to backfill the joint venture’s LNG plant at Caution Bay.
-
Australian E&P rivals will merge to form a $16-billion producer with diverse asset set weighted toward natural gas and LNG.
-
Santos is a step closer to the go-ahead for its Narrabri coal-seam gas project after gaining approval from a government planning commission. It is planning workover activities on existing wells and an appraisal drilling program.
-
The oilfield services company's Tubular Running Service was recognized for reducing costs, maximizing safety.
-
Unprecedented, perfect storm, a black swan event—all ways of describing the situation the oil and gas sector finds itself in right now. Here’s an analysis on the near-term outlook for projects in Asia Pacific.
Page 1 of 2