FPSO
-
The supermajor expects its latest development will be online by 2027 and add 250,000 B/D to Guyana's soaring output.
-
The post-salt, heavy-oil fields will be developed in tandem tied back to an FPSO.
-
The largest project to date will add a capacity of 250,000 B/D starting in 2025.
-
The contractor was tapped by Offshore Frontier Solutions to provide electrical systems and associated digital solutions for ExxonMobil’s fifth FPSO in the region.
-
FPSO Léopold Sédar Senghor will be deployed at Woodside’s Sangomar field.
-
The facility is destined for Equinor's Brazilian pre-salt development.
-
As the vessel moves toward a shipyard to be dismantled, the company said it wants to become a global reference in decommissioning, focusing on sustainability, safety, and care for people and the environment.
-
The Haewene Brim FPSO will need repairs to a pair of mooring connections before it can restart operations.
-
The contractor will transport and install pipeline related to the Wahoo development in the Campos Basin.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
Page 1 of 9