GUYANA
ExxonMobil Reaches FID for Guyana’s Payara Field
ExxonMobil is evaluating additional development opportunities in the Stabroek Block with plans for five drillships operating offshore Guyana by the end of 2020.
Liza Destiny FPSO
A VLCC converted to FPSO, Liza Destiny has a production capacity of 120,000 B/D of oil.
ExxonMobil Starts Production from Liza Field Offshore Guyana
The startup of the deepwater field marks the beginning of production from the massive Stabroek Block, which contains an estimated 6 billion BOE. ExxonMobil estimates that at least 5 FPSOs will be producing more than 750,000 BOPD from the Stabroek Block by 2025.
SBM Offshore Completes Financing of Liza Unity FPSO
As construction continues, SBM Offshore secured the $1.14 billion needed to finance work on the vessel. Liza Unity is scheduled for deployment at ExxonMobil's Liza Phase 2 development offshore Guyana.
Work Continues on Liza Unity FPSO
SBM Offshore began construction on the vessel following ExxonMobil’s sanction of the Liza Phase 2 development offshore Guyana in May. It is designed to produce 220,000 BOPD after it starts up in 2022.
FPSO for Liza Phase 1 Arrives Offshore Guyana
Following a 42-day journey from Singapore, the Liza Destiny has arrived at the Stabroek Block offshore Guyana, where it is expected to produce up to 120,000 gross boe/D from the ExxonMobil-operated deepwater project upon startup.
Are Deepwater Projects Due for a Revival?
The oil price downturn spawned a lull in deepwater enthusiasm, but better project execution and reduced project lead times have helped operators achieve lower costs and better returns. What does the landscape for deep water look like in the near term? Will operators get more involved?
Subsea Production Systems—Will 2019 Be a Tipping Point?
The past year ended with a surge of subsea tree awards as E&P operators locked in lower supply-chain cost. Will demand continue to grow in 2019 and allow subsea OEMs to build backlogs and take back pricing power?
To Sanction, or Not To Sanction—That is the Offshore Question
2019’s class of offshore projects show a wide range of potential sanctioning outcomes.
ExxonMobil Awards Second Liza FPSO Contract to SBM Offshore
Scheduled for startup in 2022, the FPSO is expected to produce up to 220,000 BOPD on the development offshore Guyana. Liza is one of eight discoveries ExxonMobil has made in area.
STAY CONNECTED
Don't miss out on the latest technology delivered to your email every two weeks. Sign up for the OGF newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
ADVERTISEMENT
MOST POPULAR
ADVERTISEMENT