Pemex

The Pemex-drilled pre-salt Yaaxtaab-1 exploration well has been classed as “non-productive” by Mexican regulators. The well was spud in November 2017 and completed in mid-December 2018. The well was drilled in 171 ft of water to a TD of 25,592 ft.